Kitchen's bar top is up. At least the structure of it.
Workers preparing the plaster ceiling. Will be done in 1-2 days.
The pipe is leaking! From the bottom of the tiles. Poor me. Luckily the developer is bearing the responsibility of repairing it. Thanks Palmex.